Load calculations with inspection outcomes
The calculation performed, the service sized against it, and whether an inspector passed it. Engineering judgment with an independent pass-or-fail label attached.
The record set AI buyers underwrite in electrical — load calculations and panel assessments with a third-party pass or fail attached, EV-charger and storage installs end to end, jurisdiction-specific code outcomes. Written for operators on ServiceTitan, Housecall Pro and Procore.
Electrical files carry something unusual: an independent third party grades the work. A load calculation is engineering judgment. A panel assessment is a recommendation. An inspection is a licensed official issuing a pass or a fail against both. That makes an electrical file a judgment dataset with an external label — and the label was produced by someone with no stake in your business.
The growth surface sits on top of it. EV-charger and battery-storage installs run the full chain: site survey, load calculation, equipment selection, permit, utility coordination, inspection, commissioning. Buyers underwriting electrification workflows want precisely that chain, and the volume of it only exists in operator systems from the last few years.
Jurisdiction variation is the third asset. The same work, inspected under different local amendments, with different outcomes. That is a dataset about regulatory variance that no single authority publishes.
The establishment base is six figures. The population running a system of record deep enough to export multi-year, structured operational history is not.
Federal data puts electrical contractors and other wiring installation contractors at 99,259 private establishments employing 1,090,630 people and paying $90.6B in annual wages.[1] Against that, ServiceTitan — the category-leading system of record for the trades — reported approximately 10,800 Active Customers across every trade combined, defined as customers with over $10,000 of annualized billings, processing $82.1 billion of gross transaction volume in the fiscal year ended January 2026.[2]
That gap is the entire basis of scarcity value. A buyer cannot assemble this data by scraping, and cannot buy it from a vendor, because the operators who hold it are a low single-digit share of the trade.
NAICS 238210 covers electrical and other wiring installation contractors, which includes low-voltage and systems work alongside conventional electrical contracting.
Residential service operators produce a different subset than commercial contractors. Both read well; they read differently.
The calculation performed, the service sized against it, and whether an inspector passed it. Engineering judgment with an independent pass-or-fail label attached.
Existing condition, capacity findings, deficiencies identified, recommendation made, and what the customer authorized. The assessment-to-decision chain.
Corrections issued, re-inspections, and how the same scope fared under different local amendments. A regulatory-variance dataset nobody publishes centrally.
Site survey, load calculation, equipment selection, permit, utility coordination, inspection, commissioning. The full electrification workflow end to end.
Reported symptom, diagnostic steps taken, root cause found, remedy applied, and whether it recurred. The reasoning chain, not just the invoice line.
Scope, panel and feeder selection, trenching and access difficulty, labor build-up, the quote, and whether it closed and at what margin.
Estimated against actual labor and material on build-outs, change orders, and the reasons scope moved. Where commercial operators are strongest.
We quote the filings rather than a payout range, because the filings are checkable and a payout range is not. They tell a more useful story than the marketing does.
Licensing revenue is real and it recurs. Reddit — the cleanest public comparable for recurring AI data licensing — reported $130.0M in the revenue line that carries its content licensing for the nine months ended September 2026, against $104.1M a year earlier.[3]
It is also concentrated and fragile. In Reddit’s own words: “substantially all of the contract value associated with our licensing revenue is derived from two of our partners. Our agreements with those partners are approaching the end of their respective current terms.” The same filing calls the model “a novel business model without an established track record.”[3] Anyone telling you this market has settled pricing has not read the disclosures.
Commodity content is repricing downward. Shutterstock’s Data, Distribution, and Services revenue fell 76% to $15.8M in the third quarter of 2026, with the metadata data offering alone down 91% year over year.[4]
Shutterstock’s decline is the strongest argument for what a electrical operator actually holds. Stock imagery is substitutable and already scraped, so it reprices. A decision chain recorded inside your operation — what was observed, what was decided, what happened next — has no substitute and was never public. Those are different assets, and they are not going to behave the same way.
And provenance stopped being optional in August 2025. Article 53 of the EU AI Act now requires providers of general-purpose AI models to “draw up and make publicly available a sufficiently detailed summary about the content used for training of the general-purpose AI model, according to a template provided by the AI Office” and to “put in place a policy to comply with Union law on copyright and related rights, and in particular to identify and comply with, including through state-of-the-art technologies, a reservation of rights expressed pursuant to Article 4(3) of Directive (EU) 2019/790”.[5] A buyer who has to publish what it trained on needs a clean chain of title. That is the mechanism that makes a documented, properly licensed operational dataset worth more than the same records obtained quietly.
Electrical splits between residential service platforms and commercial project tools, and the two produce very different files.
Dominant in residential and light-commercial electrical service. Strong joins between estimate, work performed and financial outcome.
API terms restrict certain uses. The path is always your own admin export of your own records, read against your customer terms by counsel.
Common in mid-size residential electrical. Clean admin exports; depth on load calculations and inspection outcomes depends on how the operator documented them.
Where calcs and inspection results live as attachments rather than fields, expect remediation cost in the economics.
Commercial and tenant-improvement contractors. Excellent job costing and change-order history, with heavier third-party rights entanglement.
Owner and general-contractor agreements frequently restrict disclosure of project data. Those contracts get read before scope, not after.
Smaller residential operators. The record-depth floor binds before the platform does.
A three-year minimum of usable history applies regardless of system.
Electrical carries the heaviest third-party and security carve-outs of any trade in this cluster: The standard guardrails apply on top of these, and the de-identification pass runs before any buyer sees a sample.
Systems, years, rough counts. No files, no logins, no customer data. A written yes or no in one business day.
Primary sources only — federal statistical releases and SEC filings, retrieved 2026-11-05.
Main Street Wealth LLC is an M&A advisor. Every figure on this page is drawn from the sources listed above and was retrieved on 2026-11-05; filings and federal data are revised over time. We publish no payout range, because no credible source establishes one — what a given dataset is worth depends on its depth, rights, preparation cost and whether a buyer has a matching need, and none of that is knowable from a web page. Nothing here is an offer, a valuation, or a recommendation to license, sell or disclose any specific record. We do not provide legal, tax or privacy advice; your counsel reviews the advisory agreement and any license before signing.